Committed from
Applus Idiada Karco Engineering, LLC
$14.4 Million committed in FY2018–FY2026
- District
- CA-23
- Location
- 9270 Holly RD, Adelanto, CA, 92301
- UEI
- EPH2KZN9MLB6
- DUNS
- 836432260
- Also known as
- Applus Idiada Karco Engineering LLC, Karco Engineering LLC, Karco Engineering Limited Liability Company, Karco Engineering, LLC
- Full records
- Applus Idiada Karco Engineering, LLC → every agency they're paid byDepartment of Transportation → everything they pay out
How the money flows
Committed dollars by how DOT's money reaches Applus Idiada Karco Engineering, LLC.
Contracts
$14.4M
100%
Which part of DOT
The bureaus and offices inside DOT that pay Applus Idiada Karco Engineering, LLC, by dollars committed.
What they buy
Top products and services DOT buys from Applus Idiada Karco Engineering, LLC under contract, by dollars committed.
Equipment and Materials Testing- Ground Effect Vehicles, Motor Vehicles, Trailers, and Cycles
$6.7M
Special Studies/Analysis- Technology
$2.0M
Other QC/Test/Inspect- Ground Effect Vehicles, Motor Vehicles, Trailers, and Cycles
$1.9M
Awards
The largest individual awards from DOT to Applus Idiada Karco Engineering, LLC, by dollars committed.
Competition
How many of DOT's priced contract actions with Applus Idiada Karco Engineering, LLC drew exactly one offer — a competition on paper with a single bidder. A high share doesn't prove anything improper; it's a flag worth a second look.
Single offer
23
24%
Multiple offers
71
76%
What budget it comes from
The Treasury accounts DOT's awards to Applus Idiada Karco Engineering, LLC draw on. Dollars committed on awards that span more than one account are split evenly across them.
Operations and Research, National Highway Traffic Safety Administration, Transportation
069-0650
$13.4M
83 awards
Working Capital Fund, Transportation Systems Center, Transportation
069-4522
$0
1 awards
By fiscal year
Dollars committed from DOT to Applus Idiada Karco Engineering, LLC, per fiscal year (FY2018–FY2026).
* FY2026 is year-to-date — the fiscal year is still in progress, so its total is still filling in. The striped band and dashed line mark that provisional stretch.
How to read these numbers
- Just these two
Every figure is money committed between this agency (or bureau) and this recipient — nothing either did with anyone else.
- Totals by action year
The aggregates reflect the fiscal year picked at the top, counted in the year each action happened.
- “Active in FY X”
The award list shows every award between the two with an action that year, at its full lifetime value — so a single award's amount can top that year's committed total.
- Flags, not verdicts
Competition marks contracts competed on paper that drew a single offer; Where the money went next is the sub-awards the recipient itself reported — which can lag or under-report.
- From FY2018 on
Pairing pages start at fiscal year 2018, the first year of complete assistance reporting.

