Federal contract vehicle · bpa
Igf::ot::igf Small Business Set-aside, 84 Offers Place of Performance: Vendor Site Fabrication of Commercial Services and Supplies for Goddard Space Flight Center the Advanced Manufacturing Branch (AMB) Is Responsible for Maintaining a Complete Manufacturing Facility to Meet the Center's Research and Development Requirements and Assist in the Fabrication of Hardware Requirements From Multiple Nasa Project Missions. This Facility Includes Conventional Machining Equipment, Numerically Controlled (NC) Machining Centers, Sheet Metal and Welding Fabrication Equipment and Remotely Located Staff Shops. Vendors Shall Provide Fabrication Services and Supplies to the Manufacturing Engineering Group in Their Respective Areas of Expertise for the Development of Instruments and Space Flight and Non-spaceflight Hardware Interchangeable Piece Parts. Vendors Will Manufacture Per Engineering Drawings With Aerospace Industry Tolerances and Provide Fabrication Capabilities in Accordance With the Statement of Work. to Fabricate Close Tolerance Aerospace Instruments and Space Flight Grade Parts, in Various Materials Such as (but Not Limited to) Aluminum, Titanium, High Strength Steel and Nickel Alloy, Engineering Plastics, and Composites Based on Industry Engineering Drawings, Provided in Electronic Format, to Industry Standard Tolerances and Specifications. Parts May Range in Complexity From Very Simple to Very Complex, With Quantities. Each Discipline Is Further Divided Into Subcategories Based on the Expected Size of Fabricated Parts. the Fabrications of Products or Services Proposed as "spaceflight" Are Required to Be, Iso 900I or AS9100 Complaint, Items Proposed as "non-flight" Will Not Require Respondents to Be Iso 9001 or AS9100 Compliant. Offers Shall Indicate If They Are Iso 9001 or AS9100 Complaint and Provide Supporting Documentation.
Committed
$540,298
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…