Federal contract
Wask Engineering Proposes to Refine the Design of an Piezo Actuated Throttling Valve Fabricated in Phase 1 That Has Demonstrated the Ability to Open Within 2.6 Msec to Meet the Requirements of a 100 LBF RCS Thruster. This Includes Verifying the Valve Cycle Life and Valve Leakage Amounts. Similar Valves Designed by Wask Engineering Have Operated for More Than 2X109 Cycles While Maintaining a Leakage Rate of Less Than 1X10-3 SCCM of He. the Current Valve Design Is Configured to Operate With Cryogenic Propellants and Support the Flow Rates Requried for a 100 LBF Liquid Oxygen/liquid Methane Thruster. a Piezo Actuated Valve Has Many Benefits for RCS Thrusters. the Speed With Which the Valve Can Adjust Its Throttle Position Means That With Two Such Valves the Thruster Propellant Mixture Ratio Can Be Rapidly Adjusted to Prevent Hardware Damage. the Valves Have the Ability to Continuously Throttle Over a Range of Thrust Levels, Allowing the Thruster to Operate From Zero to Full Thrust. the Piezo Crystals Use Very Little Power, Reducing the Overall Power Consumption, Again Reducing Weight.
Committed
$747,811
Paid out
$252.0K
34%
Committed, not yet paid
$495.9K
66%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…