Federal grant · project grant (b)
The via Metropolitan Transit SGR Bus Facilities Rehabilitation Project Was Allocated $3117087 in Federal Register Vol. 75 No. 229 November 30 2010. Activities Include: Vehicle Service Station Flooring Resurface With Anti-slip Coating; Replacement of Tire Shop Lifts; Bus Yard Concrete Repairs; Installation of Maintenance BLDG Emergency Generators; Upgrade of Fire System and Alarm Panels Throughout Headquarters Facilities; Administration BLDG Fire Sprinkler System Installation; Annex BLDG Fire Sprinkler System Installation; Installation of Aboveground Storage Tanks; RT Transit Center Bridge Repairs; Maintenance BLDG Hvac Replacement and Control Upgrade; Hvac Replacement at 4 Park and Ride Facilities; RT Transit Center Structural Repairs; Administration BLDG Restroom Repairs; via Metro Center Vinyl Flooring Replacement; Real Time Signage at Bus Stop; and Administration and Annex BLDG Roof Replacement. the Proposed Upgrades Will Extend the Life of the Affected Facilities Improve Service Reliability and Decrease Operating Cost.
Committed
$0
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…