Federal grant · project grant (b)
Dialysate Regeneration Based on Photo-electrochemical Urea Oxidation and Reactive Adsorption Systems - Project Summary/abstract in Phase I of This Program (STTR), We Demonstrated That We Could Engineer Our Patented Dialysis System Enabling Blood Cleansing With Just 2 Liters of H20 (dialysate Solution) to Fit Into a Rollaboard-sized Suitcase. This Reduction in Form Factor Is a Critical Element in Commercializing a Portable Dialysis System to Improve Patient Outcomes via Longer Dialysis Sessions and Also Improve Patient Satisfaction/acceptance, Freeing Them From Three Visits Per Week to Dialysis Centers. the Portable Dialysis System Eliminates Urea via a TIO2 Photo- Activated Catalyst That Decomposes the Urea to CO2 and N2 With 99% Efficiency. Our Present Manufacturing Method for the TIO2 Catalyst Involves a High Temperature, High Pressure Hydrothermal Autoclave. Though It Produces Acceptable Catalytic Activity, Reproducibility Is Poor and Due to the Extreme Conditions in the Autoclave, It Will Be Difficult, Maybe Impossible, to Scale-up and Commercialize. We Seek Funding to Develop an Ionized Gas Plasma-based Production System for TIO2 Catalyst Production. Preliminary Trials Demonstrate That We Can Produce High Activity TIO2 Catalyst Surfaces in Reasonable Time Periods. This Sbir Application Focused on the Commercialization of Our Kidney Dialysis System, Will (1) Scale Up the Plasma Production of the TIO2 Catalyst, (2) Explore Chemical Doping Using Carbon, Nitrogen, Fluorine, Phosphorous, Silver, Gold and Platinum, and (3) Demonstrate That Our New Catalyst Surfaces Are Durable, Have Good Catalytic Activity and Do Not Produce Undesirable Side-products.
Committed
$853,604
Paid out
$575.8K
67%
Committed, not yet paid
$277.8K
33%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…