Federal grant · project grant (b)
Single Molecule Dna/rna Transport and Raman Scattering Readout in a Coupled Nanochannel/nanopore Sequencing System. - Single Molecule Dna/rna Transport and Raman Scattering Readout in a Coupled Nanochannel/nanopore Sequencing System Armonica Technologies, Inc. Is Proposing to Develop a Novel, High-throughput, Label-free, Highly Accurate, Long-read Dna Sequencing Platform Based on Inexpensive Nanoscale Patterning and Self- Assembly. the Platform Consists of Nanochannels (cross Section Dimensions of ~ 100 NM); Tortuous (convoluted, 3D) Nanopores Formed by Self-assembly of Colloidal Nanoparticles; Nanoparticle Barriers Placed Across the Nanochannels; and a Metal-insulator-metal (MIM) Field Enhancement Structure Atop the Nanochannel Roof. in Operation, Single- Stranded- or Double-stranded-dna Is Partially Stretched Into a Linear Configuration in the Nanochannels, Is Blocked at Barriers Incorporated Into the Channels and Forced (by Electric Field) to Translocate Through the Tortuous Nanopores in the Roof. the Mim Structure on the Roof Locally Enhances the Electromagnetic Fields of Applied Laser Sources Allowing Surface Enhanced Coherent Anti-stokes Raman Scattering (SECARS) Detection of Individual Bases as They Pass Through the Electromagnetic Hot Spots, Thus Providing Single Base Sensitivity and Spatial Localization. the Distinct Raman Spectra of the Individual Bases Allow Label-free Sequencing. Optical Detection Allows Massively Parallel Operation Since the Only Requirement Is Separation of the Pores by More Than an Optical Wavelength, Which Is Easily Accomplished in the Fabrication. an Important Feature of the Platform Is That the Porous Roofs Allow Introduction of Oligonucleotides, Small Proteins, and Dna-binding/dna Processing Enzymes, Permitting Optional Manipulation and Modification of the Dna in the Nanochannels. the Goals of This Phase I Project Are: to Optimize the Mim Structure for Single Base Sensitivity and Spatial Localization; to Demonstrate Single Base Sensitivity
Committed
$349,200
Paid out
$47.8K
14%
Committed, not yet paid
$301.4K
86%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.