Federal grant · project grant (b)
Ultra-low-temperature (6 K) Static Nmr-dnp for Metalloproteins, Proteins in Cells, and Materials - Ultra-low-temperature (6 K) Static Nmr-dnp for Metalloproteins, Proteins in Cells, and Materials Abstract the Critical Importance of Solid-state NMR (SSNMR) Was Recently Demonstrated by, After Nearly Two Decades of Intense Efforts, Yielding the First Atomic-resolution Structures of the A40 and A42 Amyloid Fibrils That Play a Crucial Role in Alzheimer’s Disease (ad). Challenges Posed by the Inherently Low Sensitivity of NMR Can Be Improved by Reducing the Sample and Circuit Temperature to Below 100 K, or Preferably Below 35 K – Also Known as Ultra Low Temperature (ult). Combining Ult NMR With Another Emerging Technique, Denoted as Dynamic Nuclear Polarization (DNP), Shows Enormous Promise for Expanding the Role of Ssnmr by Providing Significant S/N Enhancements in Many Cases. However, Despite the Huge Gain in S/N That Is Possible From DNP, Also Performed at ~90 K, There Are Still Only a Handful of High-field Mas-dnp Systems in the U.s. – Pri- Marily Because They Are So Expensive ($3-10M). Further, No Commercially Available Instrumentation Is Availa- Ble for NMR Experiments Below 90 K, Let Alone Ult Experiments Combined With DNP. a Huge Step Forward Would Include the Development of a High-mode THZ Cavity for More Efficient Microwave Delivery to the Sample, Thus Enabling the Use of a Lower Power and Lower Cost Microwave Source. an Area of Ssnmr That Employs the Use of Non-spinning (STATIC) Samples Would Benefit Immensely From the Availability of Such a Commercially Built Ult Probe, With Option for Inclusion of DNP. Further, the Static Probe Can Serve as a Prototype for a Mas Ver- Sion of Such a Probe. the Developments Proposed Under This Project Aim to Reduce Entry Level Cost Into DNP by More Than an Order of Magnitude While Reducing Certain Operational Challenges.
Committed
$299,649
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…