Federal grant · project grant (b)
Carpinteria Valley Water District (district) Is Proposing to Construct an Aquifer Storage and Recovery (ASR) Compatible Well to Replace the Failing Smillie Well, Located at the Intersection of Lillingston Canyon Road and Casitas Pass Road. the Proposed Project Will Include Demolition of the Existing Well Site, Construction of an Asr Capable Replacement Well, Permitting of the New Well for Asr Operations, and Development of the Site to Equip the Facility for Well Extraction and Injection. the Existing Smillie Well Will Be Converted to a Monitoring Well.asr Wells Provide the District With the Option to Store Water in the Carpinteria Groundwater Basin (BASIN) During Wet Periods for Use in Dry Periods. the Well Could Inject Up to 500 Acre-feet Per Year (afy). the Well Will Also Increase the Districts Reliable Number of Production Wells From 2 to 3 and Provide Much-needed Production Capacity. the Existing Smillie Well Can Only Produce 240 Afy While the New Well Is Expected to Produce Up to 1,000 Afy (900 GPM), Which Would Increase the Districts Monthly Well Production Capacity by 27%. the District Would Be Able to Meet Customer Demand During a Stage 2 Drought Solely From Groundwater, If Necessary. the Carpinteria Groundwater Basin Was Designated by California Department of Water Resources (DWR) as a High Priority Basin Under the Sustainable Groundwater Management Act (SGMA) in 2019. the Basin Groundwater Sustainability Plan (GSP) Identifies Groundwater Overdraft During Extended Droughts as the Primary Risk for the Basin. the GSP Identified Several Projects or Management Actions to Address the Issue, Including Implementation of Asr Wells to Store Water During Wet Years for Use During Dry Years and Pumping Redistribution to Reduce the Risk of Seawater Intrusion. the Development of Asr Wells Would Provide a Means to Recharge the Groundwater Basin More Quickly Than Other Methods. Redistribution of Pumping Was Identified as Moving Pumping Away From the Coast So That Water Levels Would Remain Stable at the Coast and Reduce Movement of Seawater Into the Basin. the Smillie Well Is Currently the Municipal Well Furthest From the Coast.
Committed
$2.9 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.