Federal grant · project grant (b)
The Collbran Conservancy District Leon Peak Feeder Canal Design Project Achieves the Public Purpose of the Act Through Advancing the Implementation of a Project to Enhance Water Management. Through Watersmart (sustain and Manage Americas Resources for Tomorrow), Reclamation Leverages Federal and Non-federal Funding to Work Cooperatively With States, Tribes, and Local Entities as They Plan for and Implement Actions to Increase Water Supply Sustainability Through Investments and Attention to Local Water Conflicts. Through Planning and Project Design Grants, Reclamation Provides Assistance to States, Tribes, Irrigation Districts, Water Districts, Other Entities With Water or Power Delivery Authority, and Non-profit Conservation Groups to Conduct Planning Activities to Improve Water Supplies (e.g., Water Supplies to Disadvantaged Communities That Do Not Have Reliable Access to Water, Water Marketing, Water Conservation, Drought Resilience, and Ecological Resilience) or the Final Design of on the Ground Water Supply Construction (including Domestic Water Supply Projects for Tribes, Insular Areas, and Disadvantaged Communities), Water Management Construction and Restoration Projects. Farmers Conservation Alliance, Located in Mesa County, Colorado, in Partnership With Collbran Conservancy District, Will Complete a 60% Engineering Design Package to Upgrade the Unlined, Earthen-berm Leon-park Feeder Canal, to Address Transmission Losses Along the Canal and Create a More Reliable and Resilient Water Supply. the Leon-park Feeder Canal, Part of Reclamations Collbran Project, Is the Major Supplier of Water to the Vega Reservoir and It Is Estimated That Up to 20% Is Lost Through Seepage. the District Relies on This Water to Provide a High Quality Domestic Water Supply to the City of Grand Junction, to Deliver Water for Hydroelectric Power Generation, and to Provide a Source of Irrigation Water for the Region. the Districts Design to Either Pipe or Line the Canal Will Improve Water Conservation and Water Management Across the Districts Water Conveyance System. the Project Aligns With the Grand Junction Regional Water Efficiency Plan and Is Supported by the Colorado Department of Water Resources, Mesa County, Ute Water Conservancy District, and Several Conservation Groups.
Committed
$185,000
Paid out
$141.5K
76%
Committed, not yet paid
$43.5K
24%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.