Federal grant
The Smithfield Irrigation Company, Located in Cache County, Utah, Will Upgrade Four Diversion Structures With a New Irrigation Screen and Improved Irrigation Control Gates. the Project Also Includes Replacing a Section of a Steep Open Water Supply Canal With 1,500 Linear Feet of 24-INCH Polyvinyl Chloride Pressurized Pipe. the Existing Diversion Structures Allow for Significant Buildup of Debris Within the System, Resulting in Higher Water Pressures and Overwatering. Upgrading the Diversion Structures Will Result in Reduced Seepage Along the Open Water Supply Canal, Which Is Expected to Result in Annual Water Savings of 854 Acre-feet, Which Will Ensure a More Reliable Water Supply as Drought Conditions in the Area Worsen. the Project Will Also Allow for a Pump Station to Be Taken Offline, Resulting in a More Energy-efficient System.
Committed
$1.5 Million
Paid out
$880.2K
59%
Committed, not yet paid
$605.7K
41%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .