Federal grant
The Desert Water Agency, Located in Southern California, Will Equip the Remaining 205 Meters With Encoder Receiver Transmitters (ERTS) and Integrate Them Into the Agencys Existing Advanced Metering Infrastructure (AMI) System. This Phase of the Project Will Also Involve Installation of the Fixed Network Including Site Identification, Purchase of Materials, Construction of 7 Collector and 20 Repeater Antenna Towers and Equipment on Agency Owned Properties, and Professional Services to Configure the Fixed Network. Completion of the Fixed Network Is Necessary to Take 100 of Erts in Dwas System to Full Ami. the Project Is Expected to Result in Annual Water Savings of 561 Acre-feet, Which Will Make the Area Less Vulnerable to Impacts From Drought, Aquifer Overdraft, and Population Growth. the Conserved Water Will Help Protect Groundwater Resources by Reducing the Need to Pump Groundwater During Times of Reduced State Water Project Allocations. This Is the Final Phase of the Agencys Automated Metering Infrastructure Installation Project.
Committed
$500,000
Paid out
$179.7K
36%
Committed, not yet paid
$320.3K
64%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .