Federal grant · project grant (b)
Weber Basin Water Conservancy District (wbwcd), Located in Box Elder County, Utah, Will Construct a New Outlet Delivery Conduit Through the Earthen Dam, Install a New Delivery Conduit, and Establish a 33.3 KW Solar Array on Their Weber South Water Treatment Plant. Extreme Drought Has Affected Wbwcd S Ability to Deliver Water Out of Willard Bay Through a 45-YEAR-OLD Siphon System to Industrial and Environmental Water Users. Through Implementation of This Project, Wbwcd Will Provide Access to an Additional 50,000 Acre-feet of Water Not Previously Available With the Current System and Will Generate 64,000 KWH of Power Annually to Offset Wbwcd Energy Needs. the Project Was Identified as a High Priority in the District S Drought Contingency Plan That Was Developed by Wbwcd With Assistance From a Watersmart Drought Contingency Planning Grant.
Committed
$3.8 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .