Federal grant
1. Award Purpose - a Planning Study Funded by the Usfws and Cvpia Recently Evaluated Opportunities to Improve Juvenile Salmonid Rearing and Outmigration in the Migratory Corridor, the Lowermost 78 KM of the LSR From Orange Blossom Bridge (OBB) Downstream to the Confluence With the San Joaquin River. This Work Yielded the Identification of Over 200 Areas and Ranked and Prioritized Over 50 Priority Locations in the LSR. the Projects Proposed Herin Were a Direct Result of This Effort. the Tortuga Site Was Identified Through a Prior Study That Identified and Ranked Porjects That Could Improve Juvenile Rearing and Outmigration. the Mohler Tract Was Not Identified During That Study Becvuase the Area Was Previously Purchased by Usfws Almost 20 Years Ago and Revegetated. However, a Fire During the Summer of 2021 Caused Massive Mortality to Trees on the Property, Opening the Door to Explore Juvenile Salmonid Habitat Restoration. Moreover, Conversations With the U.s. Army Corps of Engineers (USACE) Who Own the Downstream Adjacent Parcel Suggest They May Be a Willing Partner as Well Offering Opportunity to Expand the Project Footprint and Project EFFICIENCY.2. Activities to Be Performed -restore Side Channels, Floodplain, Riverbank, Spawning (only for Tortuga) and Other Important Salmonid Habitats to Improve Spawning, Rearing, Holding, and Migratory Habitats for Freshwater Life Stages of Anadromous Salmonids in Central Valley Rivers and Their Tributaries.conduct Pre and Post Biological and Physical Monitoring, Per the Sit Tier 1 Monitoring Guidance, to Evaluate the Effectiveness of the Projects at Meeting the Needs of the Targeted Species.implement Project Designs for Salmonid Habitat Restoration PROJECTS.3. Expected Deliverable or Outcome -task 1: Baseline Data Collectiontask 2: Engineering Design and Analysistask 3: Permittingtask 4: Pre and Post Project Monitoring Study Designtask 5: Implementationtask 6: OUTREACH4. Intended Beneficiary (IES) - as a Benefit to the Public, This Project Contributes to the Maintenance and Improvement of Fish Habitat With a Goal of Increasing Populations of Chinook Salmon and Steelhead Trout by Replenishing Spawning Gravel and Improving Rearing Habitat in the Lower Stanislaus River. It Will Address Factors Limiting Fish Populations in Freshwater and Contribute to Recovery of Listed SALMONIDS.5. Subrecipient Activities - There Are No Subrecipients for This Project.
Committed
$5.1 Million
Paid out
$1.1M
21%
Committed, not yet paid
$4.0M
79%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.