Federal grant · project grant (b)
Convert 1,685 Feet of Existing Concrete Liner and 1,875 Feet of Existing Steel Pipe With 2,060 Feet of an 8-FOOT by 6-FOOT Precast Concrete Box Culvert and 1,500 Feet of 66-INCH Reinforced Concrete Pipe. Also Includes Installation of a 2-KW Vertical Axis Hydropower Turbine, a Metering Station, and Replacement of an Existing Meter at Another Turnout.
Committed
$1.1 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .