Federal grant · project grant (b)
The Mechanics of Host Cell Repopulation of Engineered Tissues - Project Summary/abstract We Propose to Determine How the Hemodynamic Environment Regulates the Attachment, Invasion, and Differentiation of Host Cells Into “off-the-shelf” Decellularized Tissue Engineered Heart Valves (tehvs). We Hypothesize That Dynamic Mechanical Stretch and Fluid Shear Stress Regulate Repopulation of the Tehv Matrix by Enhancing and Aligning 3D Matrix Adhesions and Activating Latent Tgf-beta From the Matrix. to Test Our Hypothesis, Biopolymer Scaffolds Seeded With Fibroblasts Will Be Cast in Stretchable Wells and Microfluidic Chambers Until Remodeled Into Isotropic or Aligned Neo-tissues and Then Decellularized in Situ. We Will Then Quantify the Extent to Which Vascular and Circulating Cells Adhere to and Invade the Matrix Under Cyclic Stretch (aim 1) and Dynamic Flow Conditions (aim 2) Relevant to in Vivo Implantation. Cell Attachment, Infiltration, Proliferation, Apoptosis, Phenotype, and Endothelial-to-mesenchymal Transition Markers Will Be Quantitatively Monitored Over Time. Tgf-beta Activation and 3D Matrix Adhesion Protein Content and Alignment Will Be Examined, and Associated Signal Transduction Pathways Will Be Interrogated to Determine the Mechanisms Governing the Cell Responses. the Results From This Systematic Study Will Have a Direct Impact on Tehv Development by Determining the Signals That Aid (or Hinder) Host Cell Repopulation of the Valve Matrix With the Goal of Optimizing Valve Design for Adaptive Remodeling Under Complex in Vivo Conditions.
Committed
$699,921
Paid out
$563.1K
80%
Committed, not yet paid
$136.8K
20%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…