To Continue Serving the Community and Visitors by Providing Safe, Reliable, Clean, Low Maintenance, Ease of Use Facilities for Traditional and Future Recreational Opportunities, White Pine County Will Construct an All Weather Event Center, and Upgrade, Replace or Refurbish Infrastructure at the White Pine County Fairgrounds Located in Ely, Nevada. Upgrades Include the Following Upgrade Grandstands to All Weather Material and Conduct Structure Improvements Based on Engineering Recommendations Construct a New or Remodel Current Concession Kitchen Area Based on Engineering Recommendations and Available Space to Accommodate State Regulations Construct Pay Per Use Shower Facility Within the Vicinity of the Current Restroom Facility Replace Racetrack Railing on the Current Mile Horse Racing Track Install One Vaulted Restroom Within the Infield Area at the Arena Install Pay Per Use Light Emitting Diode (LED) Lighting in the North Arena Upgrade Lighting in South Arena to Pay Per Use Led Lighting Install Multiple RV Electrical Hook Ups Within the Arena Racetrack Infield, Depending on Engineering Results. Construct an All Weather Events Center Up to Approximately 96,000 FT.2, (2.2 Acres) Depending on Planning and Engineering Upgrade Power Supply From V Phase Primary to Iii Phase Primary at the Upper Section of the Fairgrounds to Accommodate the Event Center and Existing Facilities Replace 3 5 Overnight Barns in Upper Fairgrounds Depending on Engineering and Space Recommendations Construct Covered Outdoor Overflow Holding Corrals (approximately 150 FT. X 12 FT.) Construct Storage Building for Horse Race Starting Gate (approximately 30 FT. X 30 FT.) Construct Walking Trail With Benches From Upper Fairgrounds to South Park Area Install Signage Directing Pedestrians From Upper Fairgrounds to South Park Area Install Lighting at Volleyball and Horseshoe Pit Area at South Park Install Water With RV Hook Ups If Final Cost Estimates Allow Inclusion Within the Amount Requested to Complete the Project. Construct Outdoor Livestock Holding Pens for Event Center If Final Cost Estimates Allow Inclusion Within the Amount Requested to Complete the Project.
Committed
$13.0 Million
Paid out
$321.1K
2%
Committed, not yet paid
$12.6M
98%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.