Federal grant · cooperative agreement (b)
Multiple Irrigation Diversion Dams on the Upper Clark Fork Between Warm Springs and Deer Lodge Western Montana Are Negatively Impacting Aquatic Resources River Function and Recreational Use of the River. These Diversions Which Range From Small Push Up Dams to Full Spanning Pin and Plank Style Structures Fragment Fisheries Habitat Entrain Fish in Irrigation Ditches Reduce Stream Flow Create Hazards for Boat Passage and Pose Safety Risks to Waders and Floaters. Four Diversions Alvi Beck Helen Johnson Broken Circle and Sager Lane Have Been Removed Between 2020 and 2024. Four Major Mainstem Diversions Remain Whalen Westside Valiton and Kohrs Manning.the Upper Clark Fork Fish Passage Project Will Reconnect Critical Bull Trout Habitat at the Headwaters of the Clark Fork River Through the Construction of Fish Passage Improvements and the Installation of Fish Screens at the Four Remaining Irrigation Diversions on the Clark Fork River That Impede Upstream Passage and Entrain Migratory Fish. Objectives at Each Site Include Providing Year Round Fish Passage for All Fish Species and Life Stages Preventing Entrainment of Migratory Fish in Irrigation Ditches Maintaining Irrigation Water Delivery and Improving Recreational Float Passage. in Total the Project Will Reconnect the Uppermost 27 Miles of Mainstem Clark Fork River Habitat Over the Next Four Years Complementing Ongoing Efforts in Warm Springs Creek to Reconnect an Additional 64 Miles of Habitat.this Project Targets Irrigation Diversions Prioritized for Improvement by Trout Unlimited (TU) and Project Partners Clark Fork Coalition (CFC) and the Natural Resource Damage Program (NRDP) in 2017 Through an Assessment of Fish Passage and Streamflow Restoration Opportunities on the Mainstem River. Since Then Project Partners Have Successfully Improved Fish Passage and Instream Flow at Four of the Eight Dam Sites Targeted in the 27 Mile Project Reach While Successfully Gaining Support From Irrigators and Landowners for Improving the Remaining Four Diversions Described in This Proposal. NRDP Has Prioritized Addressing Fish Passage Issues at These Diversions Under Their 2023 Upper Clark Fork Aquatic and Terrestrial Resources Restoration Plans Specifically Allocating Matching Funds Towards This Effort.this Project Will Be Split Into Two Phases. Phase 1 Will Prioritize the Kohrs Manning Diversion. Phase 2 Consists of the Completion of the Remaining Diversion Sites With the Valiton Ditch as the Second Highest Priority.on the Ground Project Implementation for Kohrs Manning Is Projected to Begin in the Late Fall of 2025. the Remaining Projects Will Be Implemented in Successive Years With Permitting and Procurement Preceding Construction at Each Site.
Committed
$1.3 Million
Paid out
$97.9K
8%
Committed, not yet paid
$1.2M
92%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.