Federal grant · cooperative agreement (b)
Located Along the Western Urban Growth Boundary of Prineville, Oregon, Ochoco Preserve (preserve) Was Acquired by the Deschutes Land Trust in 2017. the Preserve Was Acquired With a Primary Goal of Reestablishing Ecological Processes and Maximizing Fish and Wildlife Habitats, While Providing Public Access and Educational Opportunities. Attainment of This Goal Will Be Achieved by Implementing Three Phases of Restoration Across the Preserve. This Proposal Focuses on the Second Phase of Restoration (the First Phase Was Completed in 2022). Among Other Ecological Benefits, Phase Two Will Address Factors That Limit Salmon and Steelhead Production in Ochoco Creek and the Crooked River Within the Preserve. the 2010 Odfw Middle Columbia Steelheadrecovery Plan Lists the Following as Limiting Factors for the Crooked River Steelhead Population: Degraded Channel Structure, Complexity, Floodplain Connectivity, and Riparian Condition, High Water Temperature, Low Flows, Altered Hydrology and Sediment Routing, and Lack of Fish Passage, (P. 9-61). Many of These Limiting Factors Exist on Both of the Aforementioned Waterways on the Preserve and Are Reducing the Potential for Salmonid Production. in Particular, Both Watercourses Are Channelized With Minimal Floodplain. Limiting Factors Will Be Addressed in Many Ways, Such as Creating About 40 Acres of New Floodplain. Within That New Floodplain Around a Mile of New Ochoco Creek Baseflow Channel and About 0.6 Miles of New Crooked River Baseflow Channel Will Be Constructed. Over a Mile of Side Channels Will Be Constructed and Connected to the Baseflow Channels. Within the New Floodplain, About 5 Acres of Wetland Will Be Constructed. Using Excavated Earthen Material, Over 50 Acres of Uplands Will Be Crafted. All Disturbed Areas Will Be Planted With Native, Zone Appropriate Vegetation. Project Partners That Continue to Be Involved Include, But Are Not Limited to, Odfw, Pge, Confederated Tribes of Warm Springs and the City of Prineville. Funding Has Been Received by the Private Sector, Ngos, Tribes, and State and Federal Agencies.
Committed
$400,000
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.