In the Coquille Watershed, Less Than 5 of the Historic Tidal Wetlands Remain. Lack of Slow-water Refugia and Off-channel Habitat Has Been Identified as a Critical Limiting Factor Affecting Oregon Coast Esu Coho Recovery. the Leslie Wetland Reserve Is a 50 Acre Tidally Influenced Wetland Reserve Under a NRCS Conservation Easement in Perpetuity in Coquille, or (coos County). a Restoration Project in the 1990S Attempted to Revert the 50 Acres of Bottomland From Pastureland to the Historic Wetland State by Removal of Tide Gates and Drainage Ditches. the Majority of the Easement, Including the Alluvial Floodplain, Is Still in Poor Condition and Almost Entirely Lacks Wetland Function. Coqwa Has Previously Received Funding From Oweb and the Wild Rivers Coast Alliance to Pursue Data Collection and Begin the Design Process That Will Address the Following Issues: 1) Lack of Floodplain Connectivity Due to an Incised Channel 2) Hydrological Constrictions Above and Below the Floodplain Due to Undersized Culverts and 3) Lack of Native Plant Diversity and a Monoculture of Reed Canary Grass. This Solicitation Will Fund Final Restoration Designs for the Interior Wetland and Bridge Designs for Fish Passage, Permitting, a Planting Plan, and Monitoring Plan. Coqwa Will Continue to Partner With the Landowners, Coquille Indian Tribe, Usfws, Odfw, Usfs, NRCS, and Coos County Among Other Interested Restoration Practitioners to Develop a Suite of Actions to Reach Our Goals.
Committed
$148,899
Paid out
$127.8K
86%
Committed, not yet paid
$21.1K
14%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .