Federal grant · project grant (b)
The Weso Dam Repair and Wetlands Restoraton Shall Include a New Whistle Tube Structure Will Be Constructed and Installed Repairs Will Be Made to the Auxiliary Spillway With Heavy Rip Rap Erosion Control Measures Will Be Undertaken to Prevent Further Damage Dike Willbe Reseeded to Reestablish Approved Vegetation the County Will Work Closely With the DNR, Local Groups, Lake Associations and Private Entities to Lower the Water Levels, Replace the Dam and Reestablish and Enhance the Area During the Draw Down, It Is the Intent to Plant Wild Rice as Anatural Food Source, to Help Draw Wildlife Back to the Area This Area Will Provide Clean Habitat Tomigratory Birds Since Little to No PCBS Are Known to Be Present in This Creek Weso Is a Large Shallow Basin With Creek Through the Center Blanding S Turtle and Wood Turtle Are a Couplehof Reptile Species of Greatest Conservation Need That Would Benefit From Replacement of Thestructure Replacing the Structure Maintains the Hydrology Needed for Species to Use Throughoutthe Year for Breeding, Foraging and Overwintering Restoring This Wetland Is Vital to the Localbedrock Glade Community About a Dozen Species of Greatest Conservation Need Are Associatedwith the Bedrock Glade Community Type the Weso Management Plan Objective Is to Designate Habitat Management Practices, Which Will Improve the Flowage for Use by Migrating Waterfowl and Waterfowl Production and Management Techniques That Improve the Habitat Requirements of Furbearers the Draw Down Process to Replace the Dam Will Assist With Management of the Area by Stimulating New Plant Growth and Help Clarify Water Plants Serve Asspawning Habitat for Fish and Amphibians and Nesting for Birds Once Control Structure Is Repairedthe Re Flooding Period Will Allow Food Production During the Summer and Available for Waterfowland Muskrats
Committed
$45,000
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .