Federal grant · cooperative agreement (b)
The Proposed Project, Located in Shasta County, Ca, Will Address Wet Meadow, Seasonal Wetlands, Vernal Pools, Sage Steppe, and Oak Woodland Habitats Across 4500 Acres the Fall River Resource Conservation District Acquired the Lake and Macarthur Swamp Properties From Pacific Gas and Electric Company and Placed a Permanent Conservation Easement on Each Acquisition of These Properties Did Not Include the Water Rights Therefore, Managing Water From Wells and Overland Flow From Tailwater, Rain, and Snow Melt Are Vital for Habitat Sustainability the Fall River RCD Proposes to Address With This Project the Top Priority Management Needs of Each Site for Each, That Is Hydrology, Encroaching Juniper, and Revegetation on the Lake Property, the Primary Water Loss Is Through Head Cuts and Gullies, Which Will Be Addressed With Grade Control Structures Juniper Is Encroaching on Meadow Habitat, a Pine Stand, and Within an Oak Woodland, Reducing Stand Resilience and Acorn Production and Raising Fuel Loads the Third Area to Address Is the Northeast Corner of the Lake Property Past Ranching Activities Have Removed the Sage Steppe Vegetation and Resulted in Annual Grasses Dominated by Cheatgrass This Area Will Be Planted With Native Sage Steppe Brush Species on Mcarthur Swamp, the Most Extensive Management Need to Address at This Time Is the Network of Drainage Ditches That Cross All Fields Priority Is Given to Those Areas With the Most Significant Hydraulic Benefit Top Priority Will Be Given to the Vernal Pools Drained by These Ditches the Vernal Pools Will Further Be Protected by Adjusting Existing Fence Gates to Minimize and Discourage Vehicle Usage in the Pools the Total Project Will Address 300 Acres of Wet Meadows, 150 Acres of Sage Steppe, and 1 Acre of Vernal Pool Wetland Habitat
Committed
$100,000
Paid out
$30.6K
31%
Committed, not yet paid
$69.4K
69%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…