The Green Mountain Power Corporation, Gage Hydroelectric Project, Will Improve the Safety of the Dam by Replacing the Spillway Control Devices. the Existing Flashboards Are Composed of Steel Panels, Hinged at the Base and Supported by Wooden Struts on the Downstream Side. They Are Manually Installed and Are Deemed No Longer Safe by the Vermont Occupational Safety and Health Administration. the Replacement Flashboards Will Be an Automatically Controlled, Steel Plate System Operated by Air or Gas Bladders. the Facility Began Operation in 1988 and Is Located on the Passumpsic River in ST. Johnsbury, Vermont.
Committed
$1.3 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .