Federal award · direct payment for specified use, as a subsidy or other non-reimbursable direct financial aid (c)
The Central River Power Ma Limited Liability Company, Smith - Surge Tank Grout Ring Replacement Project, Will Improve the Safety of the Dam by Addressing a Deteriorated Surge Tank. the Surge Tank Is Critical to the Functionality of the Channel Structure That Feeds Water to the Turbines (penstock). Malfunction of the Surge Tank Could Result in Water Hammering and Complete Failure of the Penstock Structure. This Project Will Replace the Surge Tank Grout Ring That Prevents Leakage and Uncontrolled Release of Water. Additionally, This Project Will Replace the Rook of the Surge Tank to Support Structural Integrity. the Facility Began Operation in 1948 and Is Located on the Androscoggin River in Berlin, New Hampshire.
Committed
$37,500
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .