Federal grant · project grant (b)
Bipartisan Infrastructure Law (BIL) - Accelerating Clean Energy Resiliency for the Grid and California Water Utilities the Goal of This Project Is to Bring Clean Energy Resiliency to the Critical Infrastructure of Water Utilities and Provide Grid Operators a Highly Flexible, Coordinated, and Predictable Solution for Load Reduction During Grid Stress. This Project Will Demonstrate This Innovative Investment Which Will Be Immediately Replicable to Address the Same Grid Challenges Existing Across the Entire Country. This Project Will Deliver an Innovative, Scalable, and Clean Resiliency Solution That Provides Load Flexibility for Electric Grid Operators, Improved Reliability for Critical Infrastructure, and Economic and Health Benefits for Local Communities. the Objectives of This Project Include Demonstrating Increased Resiliency Solutions for California Water Utilities to Accelerate the Clean Energy Transition From the Industry Standard of Diesel Generators to Innovative Microgrid Projects Consisting of a Combination of Battery Energy Storage Systems (BESS) and Distributed Energy Resources; Creating Virtual Power Plants (VPP) That Provide an Orchestrated Response to Deliver Firm Capacity During Grid Emergencies, Often Triggered by Wildfire Risk and High Winds; Demonstrating How Bess and Distributed Energy Resource Management System (DERMS) Solutions Complement Existing Energy Resources to Generate Cost Savings for Local Communities While Providing Clean Resiliency; Demonstrating How Bess Deployments Reduce Emissions That Impact Local Air Quality and Carbon Emissions; Evaluating Dispatch Algorithms Which Are More Equity-focused Than the Current “economic Only” Optimization Engines by Assessing Additional Variables of Climate and Health Impacts; Reducing Risk and Accelerating the Transition to Clean Backup Power Solutions at All Critical Facilities; and Addressing the Inequalities of the Existing Energy System Through Community Engagement, Workforce Development, Diversity Focused Sourcing Strategies and the Direct Investment of Clean Energy Projects in Disadvantaged Communities.
Committed
$49.4 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.