Inflation Reduction Act (IRA) – Electrically Heated Methane Oxidation Catalysts for Robust, Efficient Exhaust Methane Abatement on Gas-fired Engines the Objective of the Project Is to Demonstrate At-scale, a Methane Oxidation Catalyst With the Longevity (= 8,000 Hours) and Performance Requirements That Will Enable Widespread Adoption in O&g Applications Utilizing Natural Gas Engines. the System Will Use an Electrically Heated Substrate to Maintain the Moc in a Temperature Band That Facilitates High Conversion Efficiencies and High Sulfur Tolerance, Overcoming the Challenges of Low-temperature Exhaust and Catalyst Poisoning Traditionally Faced by Mocs on Lean-burn Engines. the First Phase of the Project Will Be Used to Fabricate the Systems, Improve the Controller, and Demonstrate the Controller, Including Emissions and System Monitoring, at Pilot Scale. Field Trials of the Full-scale Reactor Systems for at Least One Year in Duration Will Occur During the Second Phase.
Committed
$6.0 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .