Federal grant · cooperative agreement (b)
Innovative Technologies to Eliminate Flaring From Oil and Natural Gas Production. the Objective of This Project Is to Continue Development of the Emission Control Treater (ect), a New Well Pad Processing Technology That Uses a Fundamentally Different Process to Achieve Better Separation, Replacing Existing Equipment While Eliminating Nearly All Emission Sources on the Pad. the Technology Replaces Fired Heater Treaters Through Electrification or Consolidation to a Single Fired Heater With Emission Controls, Eliminates Tank Vapors Through Better Crude Stabilization, Removes or Reduces the Need for Internal Combustion Engine Driven Compression, and Is a Simpler Skid-based Prefabricated Process Which Eliminates Most Fugitive Emissions. the Modular Nature of the Ect Enables Improved Capital Utilization Through Redeployment as Production Changes.
Committed
$5.9 Million
Paid out
$5.6M
96%
Committed, not yet paid
$238.9K
4%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .