Federal grant · cooperative agreement (b)
Advanced Engineered Structures for High Performance Direct Air Capture System the Overall Objective of the Work Is to Convert a Commercially Available Tube-in-plate Heat Exchanger to Be a Contactor for Direct Air Capture (dac). the Recipient Will Integrate a Highly Effective CO2 Adsorbent With a Binder Phase to Make Composite Coatings That Can Be Applied to the Surfaces of the Commercially Available Tube-in-plate Heat Exchanger Surfaces. the Proposed System Will Provide Rapid Thermal Cycling of the Sorbent, Thereby Increasing the CO2 Productivity. Key Metrics Include an Improved Volumetric CO2 Productivity, a Decreased Pressure Drop, Reduced Capacity Fade, and a Lower Cost, Scalable Fabrication Process. the Material System Will Demonstrate Significant Progress Towards Meeting $100/NET Tonne CO2 Removed.
Committed
$1.5 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .