Federal grant · cooperative agreement (b)
The Project Will Demonstrate a Production Pathway to Meet the Projected Stack Cost of $40/KW for 100,000 Heavy Duty Stacks Per Year. to Meet These Objectives, the Team Will Manufacture a High-performance Membrane Electrode Assembly That Meets the Program Goals of 2.5 Kw/gpgm Power at 1.07 a CM-2 and 0.7 V After 25,000 Hours of Operation. the Stacks Will Be Manufactured on an Integrated Single Line to Meet the Speed of 20,000 Stacks Per Year at the Target Rates Shown in Table 1. the Present Gigafactory Is Capable of Operating 24/7 With Three 8-HOUR Shifts. to Meet the Final Program Goals, 6 Stacks Per Hour May Be Carried Out in 6 Parallel Pieces of Test Equipment. Plug Presently Owns 3 Test Stations That Can Be Used for Break in, and the Results Will Be Extrapolated to Assume the Purchase of 3 More Stations After Completion of the Program. a Key Metric for the Program Task Is Overall Equipment Effectiveness (OEE)
Committed
$28.2 Million
Paid out
$3.0M
10%
Committed, not yet paid
$25.2M
90%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…