Federal grant · cooperative agreement (b)
The Main Objective of This Project Is to Further Develop Avium's Catalyst Technology to Achieve 2 a CM-2 at =1.7 V on a 100 CM2 Liquid Alkaline (LA) Electrolyzer. to Achieve This Objective We Will Perform Three Parallel Tasks: (1) Optimize Catalyst Growth Onto Electrodes and La Separator for Manufacturing High Current Density Seas, (2) 3D-MODEL- Driven Design of Catalyst-coated Mesh Electrode and Elastic Flow Element Geometry to Balance Catalyst Active Area With Maintaining High Mass Transfer and 3D Utilization, and (3) Develop an in Situ Catalyst Regeneration Protocol to Maintain an Effective Degradation Rate of =2.1 Mv/khr to Enable a 100,000 H Lifetime at 2 a CM-2. the Objective for Budget Period 1 Is to Develop a 15 CM2 Single-cell Flow-through Electrolyzer That Can Achieve 1.95 V at 2 a CM-2. the Objective for Budget Period 2 Is to Develop a 100 CM2 Single-cell Flow-through Electrolyzer That Can Achieve 1.85 V at 2 a CM-2 and Demonstrate the Capability to Re-deposit Catalysts and Recover Performance After a 50 MV Decrease in Cell Voltage. the Objective for Budget Period 3 Is a 100 CM2 Single-cell Electrolyzer That Can Achieve 2 a CM-2 at =1.70 V With the Capability to Regenerate After 50 MV Loss of Performance From Accelerated Start/stop Cycles and Meet an Effective Degradation Rate of =2.1 MV KHR-1 to Enable >100,000 H Life Time. This Is Also the Overall Objective for This Project.
Committed
$5.0 Million
Paid out
$1.6M
32%
Committed, not yet paid
$3.4M
68%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…