Federal grant · cooperative agreement (b)
This Project Will Focus on Achieving the Doe Electrolyzer Proton Exchange Membrane (PEM) Performance Target of 3.0 a/ CM2 at 1.8V by Optimizing Our Non-perfluorosulfonic Acid (non-pfsa) Ionomer Molecular Architecture and Membrane Design to Achieve Safe, Low-costproduction of Hydrogen in Component Optimized Commercial Electrolyzer Cells Operating at 30 Bar Pressure With a Performance Loss of <2.3 MV Over 1000 HRS. This Work Will Build Essential Fundamental Understanding of the Effects of Morphology on Performance and Durability and the Interface Interactions Between Current State of the Art Electrolyzer Membrane Electrode Assembly (MEA) and Cell Components With Non-pfsa Based Membranes. Process Development Will Ensure Scalable Ionomer Synthesis and Membrane Production Procedures Are in Place to Enable Commercialization.
Committed
$5.0 Million
Paid out
$1.7M
35%
Committed, not yet paid
$3.3M
65%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…