Federal grant · cooperative agreement (b)
The Objectives of This Project Are to: (i) Demonstrate an Optimal Anion Exchange Membrane(aem) Configuration and Mode of Operation That Will Achieve Doe Goals of 2.0 A/CM2 Operation at <1.8 V With Degradation Rate of <4 Mv/khr at a Scale of 90 CM2; and (II) Conduct a Technoeconomic Analysis Showing How These Results Will Meet a Hydrogen Production Cost <$2/KGH2. Material Compatibility for Cell Stack Components, System Operation, and Assembling New Materials Into a Cell Stack Have Been Significantly Advanced Through Previous Collaborations Between Orion and Nel. We Propose to Extend These Achievements Within This Project by Adding Characterization Capability and Manufacturing Expertise to Produce Consistent and Robust Films.
Committed
$4.9 Million
Paid out
$984.8K
20%
Committed, not yet paid
$3.9M
80%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .