Federal grant · cooperative agreement (b)
Novel PV Array System Design to Accelerate Solar Deployment, Reduce Lcoe, Reduce Land Use Competition, and Increase Siting Flexibility in the Scope of This Project, Planted Solar Will Develop Additional Technology Elements That Are Necessary to Implement the Company’s Existing Array Design Effectively on Sloped/undulating Sites, Small/irregular Sites, and Sites With Significant Sub-surface Risks (such as Brownfield Sites With Contaminated Soil or Shallow Rocks). Planted Solar Will Validate These Technical Advances on Full-scale Arrays That Exhibit Some of These Characteristics. (the Arrays Will Be Constructed Outside the Project Scope by Independent Solar Project Developers Utilizing Planted Solar’s Technology.)
Committed
$1.6 Million
Paid out
$1.6M
100%
Committed, not yet paid
$1.1K
<1%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .