Federal grant · cooperative agreement (b)
The Objective Is to Design a Mw-scale Multi-port Converter Interface Capable of Aggregating CHP, PV, and Bess for District Energy Systems Applications and Build and Deploy a 375KW Prototype for Field Demonstration. the Selected Site Already Operates a 120KW Biomass CHP That Will Be Integrated Into the Prototype Along With a 46KW PV System and 375KWH, 2H Bess That Will Be Installed Within This Project. in Addition to the Converter, an Ieee 1547 and Ieee 2030.7-COMPLIANT Microgrid Controller Will Be Deployed to Test Developed Algorithms for Economic Dispatch, Black-start, and Islanding Operation. the Project Will Demonstrate the Economic and Technical Feasibility of a Multi-port Converter for Renewable-fueled District Energy Systems.
Committed
$3.5 Million
Paid out
$1.2M
33%
Committed, not yet paid
$2.4M
67%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .