Advancing Wave Energy Technologies Through Open Water Testing at Pacwave Dehlsen Will Produce the Final Design of Their Wave Energy Converter - “centipod 1P6” for Manufacturing and Deployment at Pacwave. the “centipod 1P6” (C1P6) Is a Point Absorber Wave Energy Converter (WEC) Comprised of a Single 6M Diameter, Surface Piercing, Heaving Prime Mover “pod”, Attached to a Linear Acting Power Take-off (PTO) Within a Housing Spar and a Submerged, Stable Reference Buoyancy “backbone”, Moored With Pre-tensioned Lines. in This Manner the Device Is Internally Self-reacting But Also Ground Referenced, to an Extent. a Fundamental Principle of the Wec Is Utilizing a Light-weight Prime Mover and Active Control to Achieve Tuning to the Incident Seastates and Highly Efficient Wave Power Conversion. This Is Viewed as Being the Most Cost-effective Route for Wave Power Extraction (compare With the Large Mass Prime Movers Required for More Passive Tuning and the Ensuing High Capital Costs and Impediment to Marine Operations, Mooring System Forces and So on) and Gives the Highest Probability of Minimizing System Levelized Cost of Energy.
Committed
$1.8 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .