Federal grant · project grant (b)
The Primary Project Objective Is to Enhance the Shelter-in-place Energy Resilience of Uscg Tracen Petaluma by Installing On-site Electric Generation and Storage Assets, Ensuring Reliability of the Site’s Electrical Distribution System, and Implementing a Micro-grid With Control System That Will Allow the Tracen to Sustain Its Mission in the Event of a Sustained Electric Utility Outage. the Secondary Objectives Include: • Maximize and Utilize Onsite, Clean, Renewable, Non-petroleum Logistics Reliant Sources • Reduce the Site’s Electric Load in Order to Optimize the Ability of On-site Generation and Storage Assets to Meet Demand • Identify Additional Energy Conservation and Savings Opportunities the Affect Grant Will Enable the Project to Increase the Capacity of the Proposed Battery Energy Storage System (bess), Which Will Increase the Capacity of Clean, Renewable, Non-petroleum Logistics Reliant Sources.
Committed
$944,000
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…