Federal grant · cooperative agreement (b)
The Objectives of This Project Include the Following: 1.THROUGH Simulation, Component Testing and System-level Validation, Advance the Readiness of Down-selected Technologies From Section 2.0, From TRL2 to TRL4; 2.INTEGRATE the Aforementioned Technologies in an Air System Capable of Meeting the Boost and Airflow Demands of a 350KW Fuel Cell, Demonstrated on an Air System Test Rig; 3.VALIDATE the Developed Fcas Capabilities Versus Doe Targets via Performance, Durability, Stop/start, Freeze, and Noise Testing, Along With System Cost Analysis; 4.DEMONSTRATE, via Vehicle-level Simulations, Fuel Cell System Performance With the Developed Air System Over Real-world Transient Machine Cycles; Compare to Diesel and Diesel-hybrid Powertrains; 5.INFORM Caterpillar Product and Technology Roadmaps Based on Project Outcomes; 6.MAINTAIN or Grow Advanced Engineering Talent Pool in the U.s.
Committed
$2.0 Million
Paid out
$1.1M
53%
Committed, not yet paid
$949.6K
47%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .