Federal grant · cooperative agreement (b)
Cubicpv Inc (CPV) Intends to Demonstrate High-efficiency, High-durability and Lead-safe Metal Halide Perovskite Modules at Least 150 MM on a Side Exceeding 4W (cell Light-to-power Conversion Efficiency =20%) in Name-plate Capacity Fabricated by Slot-die Coating With an Expected Lifetime Exceeding 20 Years (T97 = 1000 HRS @ 75OC, 1 Sun and Ea >0.5 Ev). PSC PV Modules Will Demonstrate Military-specification Durability (mil-spec, Top 09-2-291), in Addition to Iec 61215 Durability Standards and an Annual Degradation of =1%/ANNUM in an Outdoor Test Facility. We Will Demonstrate Perovskite PV Modules That Experience PB Leakage Into Water =15 PPB (per U.s. Federal 40 CFR 141, §141.80(C)) Upon Breakage at PH 4 and 7. in Doing So, We Intend to Demonstrate Metal Halide Perovskite PV Module Manufacturability, Scaling, Durability, and Chemical Safety to Precondition Commercial Feasibility and Bankability.
Committed
$2.5 Million
Paid out
$1.9M
77%
Committed, not yet paid
$567.5K
23%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…