Federal grant · cooperative agreement (b)
Phoenix Boring Inc., DE-FOA-0003047, Grid Overhaul With Proactive, High-speed Undergrounding for Reliability, Resilience, and Security (gophurrs). Heterogeneous Soil Conditions Which Include Hard Rock Limit Cost Effective Undergrounding of Electric Utilities. Phoenix Boring Proposes a Modified Horizontal Directional Drilling (HDD) Method That Can Alternately Change in Situ Between a Thermal Spallation Drill for Harder Rock and a Standard Cutterhead as Needed to Reduce the Time and Cost to Underground in Hard Rock and Heterogeneous Conditions. as Part of the Project Phoenix Boring Will Complete a Detailed Design of the Most Critical Components in Their HDD System Including the Combustor for Thermal Spallation Drilling (TSD) and the Hybrid Cutterhead Such That They Can Identify and Order Long-lead and High-risk Items Early on (task 1). They Will Also Work on Developing the Test Protocols and Testing Plans as Well as Designing and Building the Test Stand for the Drill (task 2). Once Key Drill Components Arrive and Are Assembled (task 1) and the Test Stand Is Ready (task 2) the Team Will Test the Combustor and the Hybrid Cutterhead With a Boulder as Well as in Softer Soil Conditions (task 3). Finally, the Team Will Work on a Field-test Readiness Plan (task 4).
Committed
$1.7 Million
Paid out
$775.7K
44%
Committed, not yet paid
$973.9K
56%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .