Federal grant · project grant (b)
Community Project Funding/congressionally Directed Spending - Construction - Purchase of Moveable Equipment as Follows: Floor Scrubber Machine, Lawn Mower, Vital Sign Machines, Ultrasound Machine, Ultrasound Table, Ekg Machine, Tympanometer, Telemetry Unit, Infusion Pumps, Automatic Medication Dispenser, Hematology Machine, CT Injector, Emergency Radios, Bmi Scale, Rotation Mattress, Dining Room Chairs for Ltcu, Computer Servers, Id Maker, Blanket Warmer, Hot Food Tables, Patient Lift, Step Machines and a Recumbent Bike. Project 1: Location 404 N Chestnut Johnson, KS 67855 Windows Will Be Replaced Throughout the Facility in All Patient/resident Care Areas as Well as the Family Waiting Room Windows. Current Windows Are Allowing Heat and Air Conditioning to Escape, Increasing Energy Costs and Creating a Less Comfortable Patient/resident Environment. Project 2: Location 404 N Chestnut, Johnson, KS 67855 Call Light System and Wander Guard System Will Be Replaced Throughout the Facility. the Current System Is Obsolete Due to the Age of the System and Lack of Available Parts. Project 3: Location 404 N Chestnut Johnson, KS 67855 the Sidewalks, Ramps and Parking Lots Will Be Replaced Around the Campus. Uneven Pavement and Broken Curbs Created a Safety Concern and Need to Be Replaced. Project 4: Location 404 N Chestnut, Johnson, KS 67855 the Facility Washing Machine, Dryer, Dishwasher and Water Heater Will Be Replaced Due to Failing Equipment. Project 5: Location 106 G Greenwood North & 404 N Chestnut, Johnson, KS 67855 the Hvac Will Be Replaced at Our Specialty Clinic Located Across the Street From the Facility. the Equipment Was Installed in 2003 and Is Now Failing. a Replacement Chiller Will Be Purchased for the Main Facility Due to Current Chiller Near the End of It's Useful Life and Needing Frequent Repairs.
Committed
$1.5 Million
Paid out
$1.3M
87%
Committed, not yet paid
$191.6K
13%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .