Federal grant · project grant (b)
Fy 2011 Section 5309 Guadalupe Platform Retrofit Grant APPLICATIONCA-05-0210-05 Amends CA-05-0210-04 to Provide Additional Funds for the Following PROJECTS:1. Rail Replacement Program (5309) $16830002. Rail Substation Rehabilitation (5309) $14250003. Rail Overhead Catenary System (OCS) (5309) $60982504. Rail Substation Replacement (5309) $3342000THE Grant Now Provides the Following Project Funding TOTALS:1. Guadalupe Corridor LRT Platform Retrofit (5309) $25236500 (no CHANGE)2. Rail Replacement Program (5309) $7482000 (AUGMENTED)3. Rail Substation Rehabilitation (5309) $3560000 (AUGMENTED)4. Rail Overhead Catenary System (OCS) (5309) $6792000 (AUGMENTED)5. Abatement of Light Rail Left-hand Turn and Intrusion (5309) $1208141 (no CHANGE)6. Rail Substation Replacement (5309) $7392000 (augmented)guadalupe LRT Corridor Platform Retrofit Project (P-0625)REHABILITATE and Retrofit Existing Station Platforms to Accommodate Low-floor Light Rail Transit (LRT) Vehicles. Southline Project Segment Are the Station Platforms From Childrens Discovery Museum Station South to Santa Teresa and Almaden Stations in San Jose. the Project Also Includes Southline Station Elevator and Escalator Rehabilitation to Current Ada Standards and a State of Good Repair.prior Funding Increments for This Project in This Grant Include:fy 2006 Section 5309 Grant (CA-05-0210-00) $302744FY 2007 Section 5309 Grant (CA-05-0210-01) $1246132FY 2008 Section 5309 Grant (CA-05-0210-02) $13668548FY 2009 Section 5309 Grant (CA-05-0210-03) $9929952OTHER Fta Grants Requested for This Project Are: Fy 2004 Section 5309 Grant (CA-03-0654-02) $773364FY 2006 Section 5307 Grant (CA-90-Y439-00) $447885FY 2008 Section 5307 Grant (CA-90-Y628-00) $8455660FTSTIP Consistency:mtc Tip Project No: SCL030005MTC Tip No: 2009-00 2009-17PROJECT Name: Guadalupe Corridor LRT Platform Rehab Retrofitmtc Approval Dates: 05-28-2008 05/27/2009CALTRANS Approval Dates: 09/29/2008 06/17/2009FTA/FHWA Approval Dates: 11/17/2008 06/23/2009FUNDING Source:fy 06 Fta Sect. 5309: $302744 (80%)FY 07 Fta Sect. 5309: $1246132 (80%)FY 08 Fta Sect. 5309: $13668548 (80%)FY 09 Fta Sect. 5309: $9929952 (80%)LOCAL Match (1976 -cent Sales Tax): $6286844(20%)TOTAL Grant: $31434220 (100%)RAIL Replacement Program (P-0670)RAIL Replacement Program Throughout the Light Rail System (no Rail Expansion). Rail That Has Begun to Exhibit Surface and Subsurface Cracking Must Be Replaced. New Scope Includes: Removal of the Special Trackwork at the Rail Spur Near the Former Hardwood Factory at Auzerais Avenue in San Jose; Rail Destressing Along the Tasman West Line at Rio Robles in San Jose Including Replacement of Worn-out Wood Rail Ties at the Guadalupe South Line Near the Capitol Station; Clayton Crossover Including the Installation of a New Crossover Along the LRT Line Near Clayton Street in Downtown San Jose Just South of Japantown/ayer Station; Design and Construction of Two Crossovers at the Younger Avenue Half-grand Location Which Will Allow for the Future Replacement of Existing Younger Avenue Half-grand at the Same Location; and Design and Construction for Replacement of Half-grand at Younger Avenue / First Street in San Jose.prior Scope Included: Construction of Crossings at Market Street at San Carlos Street and Almaden BLVD. at San Carlos Street Rail Lubricators at First Street at Devine Street and Second Street at Devine Street Rail Replacement at Woz Way and Grinding Concrete Where There Is Not Enough Clearance for the Vehicles Wheel Flange. Routine Local Rail Rehabilitation in High-wear Areas Throughout the Light Rail System Including Areas That Have Curved Embedded Girder Rail and High-wear T-rail.this Grant CA-05-0210-05 Provides Incremental Funding of $1683000 for the Rail Replacement Program. Prior Funding Increments for This Project in This Grant Include:fy 2007 Section 5309 Grant (CA-05-0210-01) $1890000 Fy 2009 Section 5309 Grant (CA-05-0210-03) $1607250 and Fy 2010 Section 5309 Grant (CA-05-0210-04) $2301750.FTSTIP Consistency:mtc Tip Project No: SCL050002MTC Tip No: 2009-00 2009-15 2009-23 2011-00PROJECT Name: Vta Rail Replacement Programmtc Approval Dates: 05-28-2008 06/03/2009 7/22/2009 10/27/2010CALTRANS Approval Dates: 09/29/2008 06/04/2009 7/31/2009 N/afta/fhwa Approval Dates: 11/17/2008 N/a 8/24/2009 12/14/2010PROJECT in SRTP: Yes. Fy 2010-19 SRTP PG. 28FUNDING Source:fy 07 Fta Sect. 5309: $1890000 (80%)FY 09 Fta Sect. 5309: $1607250 (80%)FY 10 Fta Sect. 5309: $2301750 (80%)FY 11 Fta Sect. 5309: $1683000 (80%)LOCAL Match (1976 -cent Sales Tax): $874313 (20%)LOCAL Match (prop 1B Ptmisea): $996187 (20%)TOTAL Grant: $9352500 (100%)RAIL Substation Rehabilitation (P-0580/P-0626)THIS Project Rehabilitates Traction Power Substations Along the Guadalupe Light Rail Line to Keep Them in Good Repair Until They Can Be Replaced. Traction Power Substations Along the Guadalupe Line Are Over Twenty Years Old and Will Need to Be Replaced Over the Next Fifteen Years. a Separate Project Will Replace Two to Four Substations Per Year.this Grant CA-05-0210-05 Provides Incremental Funding of $1425000 for Rail Substation Rehabilitation. Prior Funding Increments for This Project in This Grant Include:fy 2007 Section 5309 Grant (CA-05-0210-01) $110000.FY 2009 Section 5309 Grant (CA-05-0210-03) $2025000.FTSTIP Consistency:mtc Tip Project No: SCL050049MTC Tip No: 2009-00 2009-17 2011-00 2011-07PROJECT Name: Rail Substation Rehab/replacementmtc Approval Dates: 05-28-2008 05/27/2009 10/27/2010 6/22/2011CALTRANS Approval Dates: 09/29/2008 06/17/2009 N/a Pendingfta/fhwa Approval Dates: 11/17/2008 06/23/2009 12/14/2010 Pendingproject in SRTP: Yes. Fy 2010-19 SRTP PG. 28FUNDING Source:fy 07 Fta Sect. 5309: $110000 (80%)FY 09 Fta Sect. 5309: $2025000 (80%)FY 11 Fta Sect. 5309: $1425000 (80%)LOCAL Match (1976 -cent Sales Tax): $27500 (20%)LOCAL Match (prop 1B Ptmisea): $862500 (20%)TOTAL Grant: $4450000 (100%)GUADALUPE Overhead Catenary System (OCS) Rehabilitation (P-0707)THIS Project Rehabilitates Elements of the Overhead Catenary System (OCS) Along the Guadalupe Light Rail Line According to a 2008 Assessment Study. This Project Will Begin the Recommended Rehabilitation/replacement of the Ocs.this Grant CA-05-0210-05 Provides Incremental Funding of $6098250 for Overhead Catenary System Rehabilitation. Prior Funding for This Project in This Grant Includes:fy 2009 Section 5309 Grant (CA-05-0210-03) $693750 Ftstip Consistency:mtc Tip Project No: SCL090034MTC Tip No: 2009-17 2011-00 2011-07PROJECT Name: Guadalupe Ocs Rehab Replacement Programmtc Approval Dates: 5/27/2009 10/27/2010 6/23/2011CALTRANS Approval Dates: 6/17/2009 N/a Pendingfta/fhwa Approval Dates: 6/23/2009 12/14/2010 Pendingproject in SRTP: Yes. Fy 2010-19 SRTP PG. 28FUNDING Source:fy 09 Fta Sect. 5309: $693750 (80%)FY 10 Fta Sect. 5309: $6098250 (80%)LOCAL Match (prop 1B Ptmisea): $862500 (20%)LOCAL Match (1976 -cent Sales Tax): $835500 (20%)TOTAL Grant: $8490000 (100%)ABATEMENT of Light Rail Left-hand Turn Intrusion (P-0666)IMPLEMENT Various Strategies for Reducing Track Intrusions and Left Hand Turns in Front of Light Rail Trains - Such as Striping Installation of Super-sized Red Led No Left Turn Arrows Railroad Flashers Crossing Gates Signage Etc.prior Funding for This Project in This Grant Includes:fy 2009 Section 5309 Grant (CA-05-0210-03) $1208141FTSTIP Consistency:mtc Tip Project No: SCL070045MTC Tip No: 2009-00 2009-15PROJECT Name: Abatement of Light Rail Left-hand Turn Intrusion MTC Approval Dates: 05-28-2008 06/03/2009CALTRANS Approval Dates: 09/29/2008 06/04/2009FTA/FHWA Approval Dates: 11/17/2008 N/aproject in SRTP: Yes. Fy 2009-18 SRTP PG. 22FUNDING Source:fy 09 Fta Sect. 5309: $1208141 (80%)LOCAL Match (1976 -cent Sales Tax): $302035 (20%)TOTAL Grant: $1510176 (100%)TRACTION Power Substation Replacement Program (P-0689)THIS Project Is to Incrementally Replace Traction Power Substations (TPSS) That Have Reached the End of Their Useful Lives Along the Guadalupe Corridor Light Rail Line. an Assessment Study Recommended the Replacement of Four Substations Every Five Years. This Project Will Replace Four Traction Power Substations.this Grant CA-05-0210-05 Provides Fy 2010 Section 5309 Funding of $2513779 and Fy 2011 Section 5309 Funding of $828221 for the Traction Power Substation Replacement Program.prior Funding for This Project in This Grant Includes:fy 2010 Section 5309 Grant (CA-05-0210-04) $4050000FTSTIP Consistency:mtc Tip Project No: SCL050049MTC Tip No: 2009-23 2011-00 2011-07PROJECT Name: Vta: Rail Substation Rehab/replacementmtc Approval Dates: 7/22/2009 10/27/2010 6/23/2011CALTRANS Approval Dates: 7/31/2009 N/a Pendingfta/fhwa Approval Dates: 8/24/2009 12/14/2010 Pendingproject in SRTP: Yes. Fy 2010-19 SRTP PG. 28FUNDING Source:fy 10 Fta Sect. 5309: $4050000 (80%) (CA-05-0210-04)FY 10 Fta Sect. 5309: $2513779 (80%) (CA-05-0210-05)FY 11 Fta Sect. 5309: $828221 (80%) (CA-05-0210-05)LOCAL Match (prop 1B Ptmisea): $1012500 (20%)LOCAL Match (1976 -cent Sales Tax): $835500 (20%)TOTAL Grant: $9240000 (100%)
Committed
$0
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.