Federal grant · project grant (b)
(a) Phoebus Optoelectronics' Primary Objective Is to Develop a Hyperspectral Imaging Technology the Metamaterial Spectrometer (MS) Which Minimizes the Tradeoffs Between Performance and the Size Weight and Power (swap). Our MS Technology Provides a Competitive Advantage Over Conventional Optical Systems by Enabling the Sensor to Be More Narrowly Targeted the Spectral Bands of Interest for Measuring Trace Gases and Aerosols in the Earth's Atmosphere. Additional Objectives That Will Be Met Are: Demonstrate a Swap Reduction Relative to Current Hyperspectral Systems. Demonstrate Improved Spectroscopic Performance Relative to Current Systems. Produce Sensor Datasets to Quantify Atmospheric Constituents or Spectral Indices for Land and Vegetation Characterization. Produce Sensor Datasets of Gases Relevant to Earth Science Measurements of the Atmosphere. Minimize the Total Cost of the Hyperspectral Sensing System While Maintaining State-of-the-art Performance. Demonstrate Reduction in Data Processing Times as a Result of Spectral Channel Optimization and Bandwidth Performance of the Metamaterial. Provide a Framework and Testing Platform to Tailor Future Iterations of the Technology to Specific Sensing Missions. Develop the Fundamental Concepts of the Technology to Expand It to Other Spectral Bands From the Visible to the Lwir. the Anticipated Benefits of the Proposed Technology Are: Incorporating Many Pixel-scale Filters Eliminates the Need for a Dispersive Element Within the System. Selectable Channels With Varying Passbands Measure Only Desired Channels Shrinking Detector Electronics and Data Rate Needs. Compatibility With Fast Optical Systems Makes Best Use of Available Signal Minimizing Aperture Size for a Given Measurement Performance. Enable Hyperspectral Filtering Technology to Be Used With Miniature Space Platforms Such as Cubesats. Provide a Flexible and Cost-minded Hyperspectral Imaging Platform for a Variety of Spectral Bands. Extend the MS Technology for Use in Space-based Applications Such as Long-range Laser Communication. (B) the Outline for the Proposed Work and Methodology Is as Follows: Simulate the MS Filter Design From the Unit Cell to the Finite Scale Structures Using Industry Standard Electromagnetic Simulation Software to Optimize In-band Transmission and Out-of-band Rejection. Fabricate Optimized Designs Using Standard Cmos Micro-fabrication Technologies. Optically Characterize Fabricated Test Structures and Compare Performance to Simulated Predictions. Use Optical Characterization Data to Refine Simulations Optimize Designs Fabricate Improved Test Structures and Repeat Optical Tests. Iterate Step 4 Until Test Structures Demonstrate Performance Required for a Prototype Level Device. Fabricate and Optically Characterize the Full Prototype Filter as a Standalone Device. Integrate the MS Filter Into a Complete Optical System for More In-depth System-level Testing (to Be Performed by Our Industry Partner.) Quantify Relevant Performance Data of the Prototype System and Estimate the Improvement to Earth Science Measurements. (C) Period of Performance: 3 Years (D) Entry TRL 2 Exit TRL 5
Committed
$2.1 Million
Paid out
$1.3M
63%
Committed, not yet paid
$784.3K
37%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.