Federal grant · project grant (b)
Most Items of the Current Space Food System Will Not Achieve the Minimum 5-YEAR Shelf Life Required for a Mars Mission Due to Decrements in Nutritional Quality or Sensory Acceptability. Previous Aft Studies Have Shown Critical Losses in Some Nutrients in a Number of Space Food Products After 3 Years of Ambient Storage (cooper 2015) Unacceptable Losses in Quality After 3 Years (catauro and Others 2012) and the Inability of Individual Processing and Storage Solutions to Achieve a Projected 5-YEAR Shelf Life (cooper 2015). This Task Will Investigate the Use of Hurdle Approach to Increase the Shelf Life of the Space Food System. the Study Will Produce the 5-YEAR Data Essential to Fully Inform the State of a Mars Food System and Indicate the Best Countermeasures to Nutritional and Sensory Degradation. This Study Will Investigate Stabilization Technologies Combined to Provide Multiple Hurdles to Nutritional and Quality Degradation With the Goal of Identifying Approaches That Extend the Shelf Life of the Current Food System to Five Years. This Grant Is to Initiate Lea Mohr/ameriqual to Provide Food to Be Used in the Hurdle Study. the Specific Aim of the Overall Study Is to Determine How Reduced Storage Temperatures (-80C -20C 4C) and Alternative Processing and Packaging Impact the Quality and Nutrient Concentrations of Space Food Over a 5-7 Year Shelf Life Period as Compared to the Quality and Nutrient Concentrations of Space Food Produced Under Traditional Methods and Stored at Ambient Temperature (21C).
Committed
$871,000
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .
Loading…