Federal grant · project grant (b)
The TIME-1 Project in Its Totality Will Be Let for Construction in Three Phases (contract a, Contract B, and Contract C). This Project Funds Only a Portion of the First Construction Contract Package (contract a) for the TIME-1 Project. This Project Will Fund the Construction of Approximately 141 Catenary Pole Foundations. This Project Will Fund the Construction of the Addition of Three (3) New Cross-overs to CP-257 the Replacement of the Longbrook Avenue Bridge and Installation of Approximately Eighty-eight (88) Catenary Structures Including Approximately Forty-one (41) Catenary Pole Foundations. the Remaining Scope Elements of Contract a for the TIME-1 Project Will Be Funded by the Fiscal Year (FY) 2023 Congressionally Directed Consolidated Rail Infrastructure and Safety Improvements Program Grant.the Project Will Expedite Travel for Intercity and Commuter Rail Passengers and Freight Operations by Enhancing Track, Station, Bridge, and Other Critical Infrastructure. These Improvements Will Reduce Track Outages, Cause Fewer Delays During Construction Periods, and Improve Operating Flexibility and Reliability. Public Safety Will Also Be Improved Through Two Main Pathways: Increasing the Height of Vertical Clearance Bridges Will Reduce Vehicular Bridge Strikes and Raising the Track to a Higher Inspection and Maintenance Standard Required of Class 6 Track Will Reduce the Likelihood of Infrastructure Failure.
Committed
$172.0 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .