Federal grant · project grant (b)
The Existing Baltimore Potomac (B P) Tunnel, Located Beneath West Baltimore, Dates From the Civil War Era. at Over 150 Years Old, It Is the Oldest Tunnel Along This Section of the Nec. Because of Ever Increasing Tunnel Maintenance Issues and Existing Geometric Speed Restrictions the B P Tunnel Is an Increasing Bottleneck for Operations of Maryland Area Rail Commuter (MARC) and Amtrak Passenger Trains Along the Corridor.phase I of the Program Will Design and Construct a New Tunnel for Passenger Rail, Replacing the B P Tunnel, and Modernize, Transform and Create a New Nec Alignment. the New Nec Alignment Will Include the Construction Of:two New High-capacity Tunnel Tubes That Will Primarily Serve Electrified Passenger Trains.new Roadway and Railroad Bridges.new Rail Systems, Track and Railroad Infrastructure.ventilation Facilities for Security, Life Safety, and Fire Suppression.a New Americans With Disabilities Act (ada)-accessible West Baltimore Marc Station.reconfiguration of Interlockings.the New Tunnelnamed for Frederick Douglasswill Be Used for Intercity Passenger and Commuter Rail Along Amtraks Nec, Supporting Speeds of Up to 110 MPH.
Committed
$3.9 Billion
Paid out
$531.9M
14%
Committed, not yet paid
$3.4B
86%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.