Federal grant · project grant (b)
The Project Includes the Final Design and Construction to Replace the Existing Copper Circuit Communication Network With a Fiber Network and Install Closed-circuit Television (CCTV) Cameras and Other Station Amenities at 5 Stations Along the New Have Line (NHL) Main Line and the Cos Cob Moveable Bridge. the Project Will Provide Security Upgrades at Multiple Rail Stations on the NHL Northeast Corridor (NEC) and Establish Network Connectivity Into the Fiber-optic Network at 60 Locations Including Routing of Fiber Drops to Node Houses, Control Points, Power Stations, and Motor Operated Disconnects Between Greenwich and Stamford. This Project Will Increase Safety and Speeds, Reduce Intercity Rail Travel Times, and Improve Service for All Who Travel on Connecticuts Nec.
Committed
$15.4 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .