Federal grant · project grant (b)
The Project Will Fund the Preliminary Engineering, Grant Administrative Services, Final Design, and Construction to Replace Approximately 14 Miles of 75 LB Rail With 115 LB Rail. the Project Also Includes Replacement of 3 Switches, Installation of 4 New Switches, Relocation of Two Switches, Replacement of 4 Grade Crossings, and Installation of Related Ties and Ballast.the Replacement of the Identified Rail in This Race Project Will Allow for the Industry Standard 286,000-POUND Freight Car to Move Safely and Efficiently Along the Hoosier Southern Railroad, Reducing the Risk of Derailment and Rail Defects. Accomplishing This Project Will Lead to a Reduction in Costs for the Perry County Port Authority as Well as Allow the Industries That Rely on the Train to Reduce Input Costs, Due to Increased Tonnage Per Rail Car, and Therefore the Potential Toincrease Production.the Deliverables and Tasks That Will Be Accomplished Are: Task 1: Project Management - Detailed Project Work Plan, Budget, and Schedule Task 2: Final Design Engineering Task 3: Construction
Committed
$11.6 Million
Paid out
$9.8M
85%
Committed, not yet paid
$1.7M
15%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .