Federal grant · cooperative agreement (b)
1. Purpose: the Project Will Advance Completion of High-speed Rail Passenger Service Connecting Merced, Fresno, and Bakersfield, CALIFORNIA.2. Activities: the Project Includes the Following Elements: Final Design of the Bakersfield Extension and the Merced Extension Right-of-way (ROW) Acquisition for the Merced Extension and the Bakersfield Extension (including Station Parcels) Construction of the Bakersfield Interim Extension (to a Location Near Bakersfield Airport), Delivery of Track and Overhead Contact Systems (OCS) Elements on the Bakersfield Interim Extension (including Traction Power Utility Connection, Solar and Battery Storage, as Well as Overhead Catenary Systems) Construction of the Fresno Station Design and Construction of Trainset Facilities (including a Light Maintenance Facility, a Trainset Certification Facility (TCF), an Operations Control Center (occ), and Training Center) and Design and Procurement of Six Trainsets and Driving Simulator Equipment (to Be Installed in the Occ Training Center). 3. Deliverables:-task 1: Project Administration and Management-task 2: Final Design-task 4: Right of Way Acquisition -task 5: Construction -task 6: Track and Systems-task 7: Stations 4. and 5. Beneficiary and Subrecipient: the California High Speed Rail Authority Is the Grantee and There Is No Proposed Sub-recipient.
Committed
$1.4 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .