Federal grant · cooperative agreement (b)
This Agreement Will Fund Preliminary Engineering Design Phase Efforts That Include Completing the Configuration Footprint (a Minimum of 30 Design), Conducting Value Engineering, Refining the Costs for Construction, Mapping Right-of-way, Identifying Utility Relocation Agreements, and Other Necessary Third-party Agreements for the Construction of the Merced Extension of the California HSR System. Ultimately, These Efforts Will Result in the Construction of a High-speed, Electric Powered Train System Linking the Central Valley Communities of Merced, Madera, Fresno and Bakersfield That Relieves Highway and Rail Capacity Constraints Along Central Valley Highway and Rail Transportation Corridors.
Committed
$25.0 Million
Paid out
$24.5M
98%
Committed, not yet paid
$487.4K
2%
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .