Federal grant · project grant (b)
This Project Will Replace Approximately 1.75 Miles of Rural Roadway With a Multimodal, Complete Street Throughout Which Includes, But Is Not Limited to, Stormwater Improvements, Utility Relocations, Curb/gutter Installations, New Pavement With 11' Lanes Plus 4' Paved Shoulders for Bicycles, New 5' Sidewalk on the South Side and a 10' Shared Use Path of the North Side, Construction of a Roundabout at the Intersection of 31 Road to Replace the Current Two-way Stop Configuration, Upgrade Transit Stops With Concrete Pads and Benches, Replacement of an Aging Culvert and Pedestrian Bridge Over the Lewis Wash With a Widened Box Culvert, and Replacement of the Highline Canal Bridge to Accommodate Ada Access.
Committed
$3.2 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .