Federal grant · project grant (b)
Award Purpose the Project Will Restore and Modernize Critical Infrastructure at the Puerto Nuevo Docks in the Port of San Juan Puerto Rico. It Will Reconstruct Wharves N and O Including Demolition and Disposal of the Existing Platforms Reconstruction of the Wharves and Installation of New Fender Systems and Bollards. Activities to Be Performed Component 1 Architectural Engineering Preliminary Design and Procurement Support. Develop Plans Specifications and Cost Estimate Documents Up to a 30 Percent Completion Stage for the Project. the 30 Percent Completion Stage Design Documents Will Be Used in the Procurement of a Design Build Request for Proposal to Implement the Project. the Consultant Will Also Develop Design Criteria Guidelines for the Remaining 70 Percent Design, Implementation and Operation. Provide Bid Support and Assist in the Request for Information Process During Design Build Bid Process. Component 2 Design Build Contract and Consulting and Project Management Services. Element 1 Wharf N Demolition and Disposal Existing Platforms at Wharf N Measuring 12000 Square Feet and Existing Platforms at Wharf O Measuring 8000 Square Feet Will Be Systematically Demolished. This Will Include the Removal and Disposal of Both the Concrete Elements and the Supporting Steel Piles. Underwater Inspection a Thorough Underwater Survey Will Be Conducted to Detect and Catalogue Any Submerged Debris. Subsequent Removal of Identified Debris Will Be Carried Out to Ensure a Clear Site for Reconstruction. Wharf N Reconstruction the Sheet Pile Platform Will Be Reconstructed Including a Concrete Deck and Curb and Steel Sheet Piles for Both Platforms New Wale Beam for the Coffer Cell Platform and New Steel Piles for the Steel Sheet Pile Platform. Element 2 Wharf O. Wharf O Reconstruction the Steel Sheet Pile Bulkhead Platform Concrete Mooring Dolphin and Catwalk Platform at Wharf O Will Be Reconstructed With a Concrete Deck and Concrete Filled Piles. the Bulkhead Platform Will Include a Nearly 600 Linear Foot Steel Sheet Pile and Steel Wale Beams for Structure. the Concrete Mooring Dolphin and Catwalk Platform Will Include an Eight Foot High Concrete Mooring Dolphin Cap. Fender System and Bollards Installation the Scope Also Includes the Fitting of a Fender System and the Placement of Mooring Structures Bollards at Each Wharf Which Are Crucial for the Safe Berthing of Vessels and the Effective Distribution of Mooring Forces. Consulting and Project Management Services This Phase of the Work Will Include Assisting During the Completion of Design 70 Percent Through Final Construction Documents 100 Percent. Also Assisting Through the Construction Until the Closeout of Each Project Component. the Consultant May Be Called Upon to Provide a Project Management Team to Serve as Representative Through a Portion of or Full Construction of the Project. Construction Phase During the Construction Phase There Will Be Full Time Personnel at the Field for Each Project Phase to Conduct All Activities Required for the Construction Contract Administration Including But Not Limited to Administrative Support Ensuring Compliance With the Design and Specifications Enforcement of Federal and State Regulations and Quality Assurance in Accordance With the Design and Puerto Ricos Local Regulations. Deliverables Expected Outcomes From Schedule G Page 14 of the Grant Agreement Measure Gross Tons Short or Metric.category and Description Measurement Economic Competitiveness the Movement of Gross Tonnage of Freight in the Area Defined by the Project Study Area. Secondary Variables Types of Freight Types of Intermodal Transport. Frequency Quarterly. Measure Vessel Calls. Category and Description Measurement Economic Competitiveness and Opportunity the Number of Vessels Calling to the Area Defined in the Project Study Area. Must Be Reported in Total and Disaggregated by Any of the Following Where Applicable: Vessel Type Container Bulk Roro LNG Freight Capacity Vessel Length, or Other.frequency Quarterly. Intended Beneficiary Puerto Rico Ports Authority. Subrecipient Activities None.
Committed
$53.5 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.